Intra-rater reliability (n=52):
Rater 1 (n=26): ICC=0.89 (0.77-0.95)
Rater 2 (n=26): ICC=0.91 (0.81-0.96)
Overall: ICC=0.90 (0.83-0.94)
Inter-rater reliability (n=50):
3 raters in charge of assessments.
ICC=0.84 (0.73-0.91)
Future plan: writing down a paper in English (seeking for co-author...)
沒有留言:
張貼留言